1. 首页
  2. 文档大全

DL∕T 5405-2008 英文版 城市电力电缆线路初步设计内容深度规程

上传者:阿毅44****867 2022-07-26 15:25:04上传 DOCX文件 42.89KB
DL∕T 5405-2008 英文版 城市电力电缆线路初步设计内容深度规程_第1页 DL∕T 5405-2008 英文版 城市电力电缆线路初步设计内容深度规程_第2页 DL∕T 5405-2008 英文版 城市电力电缆线路初步设计内容深度规程_第3页

《DL∕T 5405-2008 英文版 城市电力电缆线路初步设计内容深度规程》由会员分享,可在线阅读,更多相关《DL∕T 5405-2008 英文版 城市电力电缆线路初步设计内容深度规程(30页珍藏版)》请在文档大全上搜索。

1、ICS 29.060.20K 13Record No. J8062008Electric Power Industry Professional Standard of the People's Republic of ChinaPDL / T 5405 2008Code for Content Depth on Preliminary Design of Urban Power CablesIssue Date: June 4, 2008ImpIementation Date: November 1, 2008Issued by the NationaI DeveIopment an

2、d Reform Commission of the PeopIe's RepubIic of ChinaElectric Power Industry Professional Standard of the People's Republic of ChinaPDL / T 5405 2008Code for Content Depth on Preliminary Design of Urban Power CablesTranslation sponsored by : China Electric Power Planning &Engineering Ass

3、ociation Translated by: SUNTHER Consulting Co., Ltd.Reviewed by: Beijing Electric Power Design InstituteCHINA ELECTRIC POWER PRESS BEIJING, 2008图书在版编目(CIP)数据DL/T 54052008 城市电力电缆线路初步设计内容深度规程= Code for content depth on preliminary design of urban power cables: 英文 / 中华人民共和国国家发展和改革委员会发布. 北京:中国电力出版社,2013

4、.5ISBN 9787512341999. D . 中 . 城市配电-电力电缆-输配电线路-设计规范-中国-英文 . TM247-65中国版本图书馆CIP 数据核字(2013)第 055144 号中国电力出版社出版(北京市东城区北京站西街 19 号 100005 ) 北京博图彩色印刷有限公司印刷*2013 年 5 月第一版2013 年 5 月北京第一次印刷850 毫米×1168 毫米 32 开本 1 印张 21 千字敬 告 读 者本书封底贴有防伪标签,刮开涂层可查询真伪本书如有印装质量问题,我社发行部负责退换版 权 专 有翻 印 必 究DL / T 5405 2008Contents

5、Foreword1 Scope12 Normative References23 Terms and Definitions34 General45 Specifications65.1 Overview65.2 Power System Access Scheme75.3 Power Cable Route75.4 Meteorological Conditions and Soil Characteristics85.5 Selection of Power Cables and Their Accessories95.6 Overvoltage Protection, Grounding

6、 and Section95.7 Communication Interference105.8 Laying Mode, Support and Fixing of Cables105.9 Cable Terminal Stations and Poles (Towers)115.10 Design of Oil Supply for Oil-filled Cables115.11 Civil Engineering Work125.12 Cable Corridor Subsidiary Facilities145.13 Cable Corridor Fire Protection Des

7、ign145.14 Treatment of Special Areas in Cable Laying145.15 Environmental Protection and Labor Safety155.16 Other Descriptions155.17 Appendix166 Drawings177 Items Needing Calculations19IDL / T 5405 20088 List of Main Equipment and Materials209 Budgetary Estimate219.1 Notes on Preparation219.2 Prepara

8、tion of Budgetary Estimate22IIDL / T 5405 2008ForewordThis code is prepared as required by the Notice on Issuance of Development & Revision Plan for Industry Standards in 2007 issued by the General Office of National Development and Reform Commission (FGBGY20071415).This code is proposed by Chin

9、a Electricity Council.This code is solely managed and interpreted by the Technical Committee on Electric Power Planning and Engineering of Standardization Administration of Power Industry.This code is drafted by Beijing Electric Power Design Institute. The participants in the development of this cod

10、e also includeShanghai Electric Power Design Institute Co. Ltd.Drafters of this code are Xia Quan, Ouyang Xiaomei, Wei Yanping, Fang Hao, Sun Ruiting, Tan Lei, Han Xiaopeng, and Zhou Wuying.The opinions and suggestions proposed during the implementation of this code are to be referred to the Standar

11、dization Center of China Electricity Council at the following address: No. 1 Ertiao Lane, Baiguanglu Rd., Xuanwu District, Beijing 100761 China.This code is translated by SUNTHER Translation & Solutions under the authority of China Electric Power Planning & Engineering Association.IIIDL / T


文档来源:https://www.renrendoc.com/paper/212730815.html

文档标签:

下载地址